Construction experts at monitors
For contractors

LOGISTICS & EXECUTION FIRMLY IN HAND

Simulate complex construction sequences before the first excavator moves. Spot bottlenecks early, safeguard schedules and possessions, and bring everyone involved onto one shared, comprehensible planning basis.

Get in touch
Trusted by leading contractors and public clients
From risk to advantage

OUR ANSWER TO YOUR CENTRAL CHALLENGES

01How you know it

Bids priced under uncertainty

Prices are calculated with thick risk buffers because the construction sequence rests on assumptions. The result: either too expensive to win the job or too tight for the margin.

What we do

Simulate the complete construction sequence in advance. You price and prepare the work on a validated sequence, not on assumptions. Sound prices instead of gut feeling.

The result

More jobs won, with stable pricing and a better margin.

02How you know it

Site logistics only get optimised on site

Site logistics and processes are planned as-is. Potential improvements go unused, bottlenecks show up too late and feed straight through to costs.

What we do

You run site logistics, material flow and processes through the model and optimise from as-is to target state without consequences, before costs arise on site.

The result

Optimised processes, lower costs and fewer project risks.

03How you know it

Too many parties, too many assumptions

Without a shared basis, everyone decides on their own assumptions. Coordination costs time, knowledge stays in people’s heads and is lost again with every project.

What we do

Visualised sequences create transparency and a shared language among all stakeholders. Decisions are made on sound scenarios, and the knowledge is built up centrally.

The result

Greater confidence to act, fewer project risks and knowledge built up centrally.

Lean & takt

Your takt plan says who works where and when. It does not say whether it adds up.

Takt planning and lean construction bring structure, reliability and team discipline to the site — we change none of that. What visual takt planning cannot do is capture how processes, resources, logistics and building states actually interlock. That is exactly where simulation comes in: it calculates the takt through before it becomes binding in the weekly plan. Your lean organisation gains a sound basis — not a new method.

From practice
Hubert Rhomberg

“Gaming meets construction. With dProB, BII GmbH has managed to make our experts’ knowledge of construction processes tangible in a playful, virtual way. A disruptive approach with the potential to simplify a great deal.”

Hubert Rhomberg
CEO & Co Owner of Rhomberg Group & Founder of CREE

Let us talk about your challenges

Your direct contact
Marlon Gilfert
Process Engineering & Project Consulting
Portrait of Marlon Gilfert

Tell us briefly about your project — we will get back to you personally within one working day.

Mit dem Absenden werden Ihre Angaben zur Bearbeitung Ihrer Anfrage an HubSpot übermittelt (Art. 6 Abs. 1 lit. b DSGVO). Weitere Informationen in unsererDatenschutzerklärung.